On site inspection confirmation, rack area (F1~F2)

 

 

 

1. Check whether the front and rear wiper plates of each rack are in place, and whether the hydraulic control valve is normal to avoid the wiper plates falling back due to wind pressure fluctuations.

 

 

 

2. Whether the front guide ruler of each rack is in place, and whether the operation side and transmission side are aligned.

 

 

 

3. Whether the rear guard plates of each rack are in place and whether the height difference with the lower working roller meets the specified requirements.

 

 

 

4. Whether the scraper plates of each rack are in place, blocking the rollers, and the scraper screws are tightened without any defects.

 

 

 

5. Check and clean the debris on the guide ruler and rear guide guard board of each rack.

 

 

 

Flying shear area (plate head pit)

 

 

 

1. Check if the middle roller conveyor guard plate is displaced and if the gap between the roller conveyor and the guard plate is too large.

 

 

 

2. Whether the flying shear slide is blocked, the plate head baffle should be opened normally, and the plate head bucket should be placed properly.

 

 

 

3. The plate heads and other debris inside the high-pressure water phosphorus removal box should be cleaned thoroughly

 

 

 

4. The inlet pinch roller should descend normally, and the outlet pinch roller should be in an elevated state.

 

 

 

5. Check and confirm whether the flying shear and the cutting edge are in the main position.